Post by helenagamecock on Feb 9, 2024 11:45:09 GMT -6
I wonder what the seating capacity will be? I think troy is 400.
|
|
|
Post by troysux on Feb 11, 2024 7:00:47 GMT -6
Anyone know if the size of the building is same as Troy's? If it is, then the amenities will be the same except for the scoreboard. They have youtube video's of there facility for comparison. It's hard to compare the two directly, just looking at the footprints. JSU's appears to be larger, but troy state's is a lot more ornate. Also, while our FOC completely replaced (and greatly expanded) our old field house, troy state's building was essentially a new construction that connected to the existing Davis Field House, which sits northwest of the stadium. (Nothing got demolished to build the new building.) Both buildings stretch the width of the end zone, but whereas JSU's FOC is basically a large, fat rectangle, troy state's building is a narrower rectangle with the old Davis Field House acting as a "wing" on the northwest corner. If you compare square footage, they're probably pretty close to each other, but that's just a very rough guess. (It's also important to note that both schools have some amenities spread around to other parts of the stadium and/or nearby buildings.) What does FOC stand for?
|
|
|
Post by leeroy on Feb 11, 2024 8:32:34 GMT -6
It's hard to compare the two directly, just looking at the footprints. JSU's appears to be larger, but troy state's is a lot more ornate. Also, while our FOC completely replaced (and greatly expanded) our old field house, troy state's building was essentially a new construction that connected to the existing Davis Field House, which sits northwest of the stadium. (Nothing got demolished to build the new building.) Both buildings stretch the width of the end zone, but whereas JSU's FOC is basically a large, fat rectangle, troy state's building is a narrower rectangle with the old Davis Field House acting as a "wing" on the northwest corner. If you compare square footage, they're probably pretty close to each other, but that's just a very rough guess. (It's also important to note that both schools have some amenities spread around to other parts of the stadium and/or nearby buildings.) What does FOC stand for? Forward Operating Concession (Stand) ...or Football Operations Center
|
|
|
Post by jaxstate_student25 on Mar 2, 2024 19:26:47 GMT -6
|
|
|
Post by cockygolfer on Mar 4, 2024 9:20:30 GMT -6
Thanks, the same were on IG last week too.
Anybody have outside pics of the press box area or updates on the finishing's of the exterior of the building?
With so much interior work being done, the exterior must be (HOPE) close to finished.
|
|
|
Post by jaxstate_student25 on Mar 4, 2024 10:54:30 GMT -6
Thanks, the same were on IG last week too. Anybody have outside pics of the press box area or updates on the finishing's of the exterior of the building? With so much interior work being done, the exterior must be (HOPE) close to finished. It is almost done! The 2 big sections (in the middle (front and back)) are still green and needs to be turned grey (according to the rendering). They still need to put in the seats as well. The parking lot and sidewalk are almost finished (I think). As far as the old press box, I don't have any pictures, but they are working pretty hard on it
|
|
|
Post by oldkappasig on Mar 4, 2024 16:50:40 GMT -6
The flooring will be great ---- A JSU KAPPA SIG is doing it!!!
|
|
|
Post by jaxstate_student25 on Mar 4, 2024 21:35:52 GMT -6
The flooring will be great ---- A JSU KAPPA SIG is doing it!!! Is it going to be special with JSU Graphics or something?
|
|
|
Post by oldkappasig on Mar 5, 2024 6:19:46 GMT -6
Not sure about that. Just know one of my fraternity brothers is a sub contractor.
|
|
|
Post by jaxstate_student25 on Mar 5, 2024 11:10:19 GMT -6
I wonder what those 3 particular rooms will be
|
|
|
Post by brother on Mar 5, 2024 11:43:42 GMT -6
I wonder what those 3 particular rooms will be Middle one appears to be an auditorium for team meetings.
|
|
|
Post by pubdaze on Mar 6, 2024 7:20:34 GMT -6
I wonder what those 3 particular rooms will be Middle one appears to be an auditorium for team meetings. The one on the far right appears to be some sort of hydrotherapy room or pool area, based on the drain's in the floor?
|
|
|
Post by jsu02 on Mar 6, 2024 18:29:55 GMT -6
Middle one appears to be an auditorium for team meetings. The one on the far right appears to be some sort of hydrotherapy room or pool area, based on the drain's in the floor? Concur.
|
|
|
Post by redcocks on Mar 15, 2024 9:16:21 GMT -6
I was there in Jacksonville last weekend to see us play Iowa and the building looks amazing. Can’t wait to see the finish product.
|
|